The Fountain Company Introduces You to the Installation Details of the Music Fountain | Fountain Design - Fountain Company - China Fountain Company 【Brand Fountain Manufacturer】 - Fountain Design - Fountain Company - China Fountain Company 【Brand Fountain Manufacturer】
News news
Location nowHome > News > The Fountain Company Introduces You to the Installation Details of the Music Fountain

The Fountain Company Introduces You to the Installation Details of the Music Fountain

Publish Time:2019/04/16 News Number of views:858

The music fountain early rise equipment is installed in artificial water, and the bottom or wall of the fountain pipe bracket is fixed by expansion bolts, and the equipment is installed and debugged to treat the water. In recent years, musical fountains have been widely used in reservoirs, lakes, rivers and other waters. In these waters, there are two methods of installing musical fountains, one with springs and one without water. 
Anhydrous installation means that by means of emptying, a dike or dam will be installed in a bucket separating the floor area from the water area. Fountains installed in these waters are diverse in their methods and can be classified according to construction conditions as no water and water two boxes installed. Waterless installation refers to the way in which the drainage, embankment or dam is installed in the waters of the fountain, and the area of the building area is stopped. Normally, when the water level changes to 0.15 micron or less, there is a fixed fountain installation, that is, a reinforced concrete foundation platform is poured in the fountain area, and the fixed steel structure is mounted on the platform and installed in the steel structure fountain equipment. When the water level changes more than 0.15 meters, floating fountains need to be raised and lowered to adapt to the dynamic change of water level.
The piling method is widely used for water installation, and the end of the pile machine will be piled up to the depth of the underwater soil layer. The steel structure platform fixed at the position where the pile is properly raised is installed at the other end of the fountain equipment on the platform.

 

Name:
Email
Message: