Fountain company on-site installation and commissioning of fountain
Publish Time:2020/06/02 NEWS 未分类 标签:fountain companyNumber of views:730
Fountain company on-site installation and commissioning of fountain:
On site installation personnel must wear safety protection equipment. Assemble on site according to the design drawing and the number of assembly in site. After the assembly is completed, the inspection and repair shall be carried out strictly once again.
When the electrical equipment is tested at the delivery point, a special person shall be responsible for communication monitoring and recording various data. In case of any non-compliance with the design requirements, it shall be repaired or replaced in time. It is strictly prohibited to carry out the commissioning operation of electrical components in the presence of no supervisor.
After assembly, the sundries on site and in the pool shall be completely removed, and then water shall be injected into the pool. Adjust the water level to the design water depth with the overflow pipe of the pool, and then carry out pressure test and spray test. Check whether the control procedures, waterscape modeling, colorful lights, safety measures, etc. meet the design requirements, and deliver them to the operation after acceptance.
- Three effects determining the effect of dr...
- Fountain design is the crowning touch in g...
- What four points should we pay attention t...
- Which fountain company is better?
- Fountain Company introduces some misunders...
- What are the types of fountain nozzles?
- Laser water curtains add color to the city
- Notes on the design and construction of mu...